New features 
1

New calculation of swath footprints taking into account the Earth geoid.

2

The time bar in the 3D map has been redesigned incorporating a small toolbar with buttons for sliding left and right, zoom in and out, and fit to time boundaries.

The toolbar is usually hidden, and appears only when moving the mouse on the top area of the screen.

3

New "time filter" feature, to display only swaths that fall inside the filter time window.

4

New Minimum Incremental Coverage parameter in the Coverage constraint, applicable to sensors and AOIs.

It should lead to optimized coverage solutions with fewer swaths needed.

5

Option to update always TLEs at program start. See Edit / Properties / Satellites / Orbits

Fixed source 
1

Fixed out of bounds sensor geometry. Before when a sensor geometry was such that the field of view fell out of the Earth disk (e.g. extremely wide swath) the software was unable to derive a proper footprint, and in certain cases it crashed.

Now SaVoir will detect this situation and produce a footprint of the tangential field of view. This has permitted to create swath footprints of the geostationary Sentinel-4 mission

2 Fixed internal web browser to avoid warning error when executing java scripts.
3 SPOTLIGHT mode has been modified to remove the Terrain correction option. This feature is now embedded in all swath footprint calculations when applying the Earth Geoid.
4 Fixed bug when rendering long swaths, longer than one orbit. Swaths where rendered with their flip sides.
Configuration updates 
1

Added 3D Model of Sentinel-4 / MTG-S

2

Added 3D Model of Sentinel-6 / Jason CS

3

Added 3D Model of Sentinel-5 / MetopSG

4

Added 3D Model of Biomass

5

Added 3D Model of RISAT-2

6 SPOT-7 is now configured in SSO orbit
7 Added RISAT-2
8 Added Biomass
9

Added Skysat-2 after its recent launch.

10 Added Meteor-M2 TLE orbit after its recent launch
11 Added AISSat-2 after its recent launch
12 Added Sentinel 4 / MTG-S, Sentinel-5/MetOp-SG, and Sentinel-6 / Jason CS
13 TLE addresses updated
14 Added new Flock-1B series satellites after recent launch
15

Added Gaofen-2 after its recent launch

16

Added Two Line Elements orbit to WorldView-3 after its recent launch

17 Sentinel-1A orbit has been reconfigured with the sun-synchronous nominal 12 day repeat cycle.
18 ALOS-2 orbit has been reconfigured with the sun-synchronous nominal 14 day repeat cycle
19

Added PERSEUS-M1 and M2.

Added DX1.

 

Multisatellite Swath Planner - © Taitus Software Italia srl All rights reserved- info:  support@taitus.it